UPDATE: South Pascack Road Closure for NYSDOT Bridge Project

The New York State Department of Transportation (NYSDOT) has announced an update to the ongoing Route 59 Bridge Replacement Project in the Town of Ramapo.

South Pascack Road, between Pipetown Hill Road and Perlman Drive, will remain closed for approximately three weeks as crews continue critical work to replace the Route 59 Bridge over South Pascack Road — a project aimed at ensuring the long-term safety and reliability of the roadway.

Key Information from NYSDOT:

  • South Pascack Road will be closed to through traffic, but local access will remain open for residents and businesses up to the work zone.

  • Temporary delays are expected in the area.

  • A signed detour route has been established — drivers are urged to follow all posted detour signs for their safety and for the safety of highway crews.

📞 For questions or additional information, contact the NYSDOT Field Office at (845) 270-6030 or (845) 270-6031.

📰 Read Monsey Scoop’s original report: South Pascack Road in Spring Valley to Close November 3–14 for Route 59 Bridge Replacement Project

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Most Popular

Rockland County Confirms 3 Measles Cases Linked to International Travel

Rockland County Department of Health (RCDOH) has confirmed three...

Clarkstown Supervisor George Hoehmann Announces 2026 Re-Election Campaign

George Hoehmann has formally announced his candidacy for re-election...

SLOATSBURG: Second Alarm Blaze Erupts at Sterling Carting Facility On Sterling Mine Road

A second-alarm structure fire broke out at approximately 1:45...

Rockland County Opens Digital Park Permitting System for 2026 Season Rockland County Division of Environmental Resources

Rockland County Division of Environmental Resources has officially opened...